Build log
18 Jul 2026
Inside the line-follower rebuild
How Cohort 07 re-tuned their PID loops to 100 Hz and shaved two seconds off the track.
Read the story →Build logs, field notes and spotlights, written by the people doing the work.
Bootcamp takes a box of parts to a first hover in five days.
Cohort 07 rebuilt their control loops and took two seconds off the track.
Logs, recaps and spotlights from six provinces.
How Cohort 07 re-tuned their PID loops to 100 Hz and shaved two seconds off the track.
Read the story →Every spotlight above started with someone reserving a seat.
Enrol now →Answers can be wrong — check course pages before paying.